Ok, this is a test. If this were a real report, it would presumably have some useful information in it.

Here is one comparing the success rate of most ISCAS85 circuits when using a composite delay dictionary from stuck-at simulations with restricted vectors dropped and required vectors marked. The X axis is (delay size/strobe time), the Y axis is percent success. Graph 1


imthurn@cse.ucsc.edu